❗The content presented here is sourced directly from Youtube platform. For comprehensive course details, including enrollment information, simply click on the 'Go to class' link on our website.
Updated in [July 18th, 2023]
This course overview will provide an in-depth look at the GIANT Shower Renovation - Master Bathroom Remodel project. The project took 20 days and had a rough ballpark cost of $25,000 USD or $33,700 CAD. The course will cover the demo, opening subfloor, shower drain, covering window, framing, plumbing, LED niche wires, recessing subfloor, floor heat, electrical, shower bench, closing walls, waterproofing, subfloor/floor heat, tiling ceiling, tiling vanity, rainheads, shower floor, tiling walls, tiling floor, niche cutout, grout, niche light/silicone, painting, fixtures, trim/toilet, and reveal.
Tools and materials used in the project include a laser level, tile lifter, plumbing SharkBite removal tool, SharkBite cap, PEX crimp & cutter, pipe/fitting reamer, pipe cutter, LED niche, tape light, driver, profile, Schluter Deco SG, wet saw, grinder, polishing pad, diamond hole saw, diamond drill bit, grinder disk w/flange, ½ trowel, ¼ trowel, 3/16 V notch trowel, mixing drill, waterproofing, fixtures, impact driver/drill, sawzall, SDS, laser, brad nailer, circular saw, mitre saw, and table saw.
At the end of the course, participants will have a comprehensive understanding of the GIANT Shower Renovation - Master Bathroom Remodel project and the tools and materials used.